摘要
通过对河北热电有限责任公司#22机、#23、#24炉所组成的扩大单元制首次满负荷滑停的过程进行分析,提出了3种可参考的滑停方式,同时进一步分析了机炉的冷却时间与检修工作安排问题。
No. 22 turbine-generator and No. 23 and 24 boilers form an enlarged power generation unit. The author analyzes its slide shutdown process from full load and suggests three options of slide shutdown of CFB for reference. The cooling time of turbine-generator and boilers and the maintenance arrangement are also considered.
出处
《河北电力技术》
2003年第6期47-49,共3页
Hebei Electric Power