摘要
通过简要分析(16+18+16)m现浇变截面箱梁的施工,对此种结构的施工、监理重点环节予以提出,并在施工中加以重视。
The paper analyzed the construction of (16+18+16) m variable cross-section box beam,and proposed its main point of construction and supervision for reference.
出处
《山西交通科技》
2003年第A01期95-97,共3页
Shanxi Science & Technology of Transportation
关键词
支架
钢筋
浇筑
裂缝
预防
support
reinforcement
grouting
crack
prevention