摘要
叙述了耐张段包含有多个紧线段确定紧线应力的计算过程,并给出了具体的实例,以便于工程人员实际施工中使用.
This paper introduces a calculation process how to confirm the tight line stress in the standing stress section including several tight line sections.And some specific examples are provided.It is convenient for engineers to use in actual construction.
出处
《南昌水专学报》
CAS
2003年第4期28-29,共2页
Journal of Nanchang College of Water Conservancy and Hydroelectric Power