摘要
研究带有固定区间的两个代理单机排序问题.第一个代理工件可中断,且工件到达时间与工期满足一致关系,目标函数为最小化总误工.第二个代理工件被安排在固定时间窗口.目标是寻找一个排序,使得满足第二个代理目标可行情况下,第一个代理目标函数值最小.在固定区间等于加工时间的情况下,利用分块原则,提出了一个伪多项式时间动态规划算法,并给出了固定区间大于加工时间情况下的时间复杂度分析.
This paper considers two agent scheduling problems with fixed time windows on a single machine.The jobs of the first agent might be preemptive.There exists agreeable condition with release time and due data.The objective function is to minimize the total tardiness.The focus is to find an optimal sequence that minimizes the objective of the first agent,while keeping all jobs of the second agent schedule within fixed time windows.By block principle,we present a pseudo-polynomial time dynamic programming algorithm when fixed time window equals the processing time.If the fixed time windows is larger than the processing time,we give the time complexity of the proposed problem.
作者
陈秋宏
张新功
CHEN Qiuhong;ZHANG Xingong(College of Mathematics Science,Chongqing Normal University,Chongqing 400047,China)
出处
《运筹学学报》
北大核心
2019年第1期61-71,共11页
Operations Research Transactions
基金
国家自然科学基金(Nos.11571321
715610007)
贵州省教育厅项目(No.14zd007)
重庆市科委自然科学基金(No.cstc2018jcyjAX0631)
关键词
单台机器
两个代理
总误工
固定时间窗口
single scheduling
two-agent
total tardiness
fixed time windows