摘要 为解决常规卫星任务规划方案面对应急任务插入时,调整后的方案相对于原始方案差异较大,卫星重调度难度大的问题,本文提出总时间重叠度及总任务执行时长两项鲁棒性指标,建立面向应急任务卫星鲁棒性规划模型,并基于经典的多目标进化算法NSGA-П设计卫星鲁棒性任务规划算法求解。仿真实验表明新应急任务到来时,使用该方法得到的卫星鲁棒性规划方案较常规卫星任务规划方案及考虑邻域指标的鲁棒性卫星任务规划方案,更易于调整,引起的新老调度方案差异相对较小,卫星能量消耗也相对较低。 In order to reduce the difference between original satellite schedule and new adjusted one for emergency task,this paper proposes robust indicators based on overlap time & the total task execution time,and establishes robust imaging satellite mission planning model in emergency situation,then designs robust satellite mission planning algorithm,based on classic multi-objective evolutionary algorithm NSGA-П,to solve the model.The simulation results show that overlaptime&total task execution time indicators of satellite schedule which obtained by the method above,compared to that of schedules which just consider task weight-sum and which consider task weight-sum and schedule’s neighborhood size,tend to be more excellent when these schedules’task weight-sum indicators are approximate,so when new emergency task arrives,the schedule,obtained by the method proposed by this paper,is easier to adjust and the difference between the new schedule and the old one is smaller and cosumes less energy.
出处 《遥感信息》 CSCD 2014年第5期25-31,50,共8页 Remote Sensing Information
基金 国家重点基础研究发展计划课题(2011CB707102) 国家高技术研究发展计划课题(2012AA121302) 国家科技支撑计划课题(2012BAH12B01 2012BAH12B03)
关键词 卫星任务规划 应急任务 鲁棒性 NSGA-П satellite mission planning emergency task robust NSGA-П
  • 相关文献

参考文献5

二级参考文献68

  • 1李菊芳,谭跃进.卫星观测系统整体调度的收发问题模型及求解[J].系统工程理论与实践,2004,24(12):65-71. 被引量:24
  • 2阮启明,谭跃进,李菊芳,陈英武.对地观测卫星的区域目标分割与优选问题研究[J].测绘科学,2006,31(1):98-100. 被引量:14
  • 3Jenson M T. Robust and flexible scheduling with evolutionary computation[D]. Denmark : University of Aarhus ,2001.
  • 4唐乾玉 吴秋峰 韩曾晋.加工时间扰动时一类排序问题的性能分析.控制与决策,1995,10(6):525-530.
  • 5Selcuk G. Robustness and stability measures for scheduling[M]. Bilkent University, 2001.
  • 6Sorensen K, Sevaux M. Robust and flexible vehicle routing in practical situations[C]//Proc, of the 5th Triennial Symposium on Transportation Analysis ,2004.
  • 7Sanmarti E, Espuna A, Puigjaner L. Batch production and preventive maintenance scheduling under equipment failure uncertainty[J]. Computers and Chemical Engineering, 1997, 21(10) :1157 - 1168.
  • 8Pemberton J C, Greenwald L G. On the need for dynamic scheduling of the image satellite[C]// Colorado: Pecora 15/Land Satellite Information IV/ ISPRS Commission I/FIEOS Conference Proceedings, 2002.
  • 9Liao D Y, Yang Y T. Satellite imaging order scheduling with stochastic weather condition forecast[C]//IEEE International Conference on Systems, Man and Cybernetics, 2005, 3:2524 - 2529.
  • 10Gerard V, Thomas S. Solution reuse in dynamic constraint satisfaction problems[C]//Proc, of the 12th Conference on the American Association of Artificial Intelligence, 1994 : 307 - 312.

共引文献38

同被引文献54

引证文献4

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部