摘要
以淮南张集矿硐室施工为例,运用数值模拟计算了分层开挖法在深井大硐室围岩稳定性中的影响及控制方法,得到分层开挖的应力应变状态,开挖松动区的大小直接影响到支护参数。现场工业性试验监测表明了分层施工法在深井大硐室围岩稳定性中的优越性。
Taking Huainan Zhangji mine's cavern construction for example,this paper used the method of numerical simulation to do research into the influence and control method of excavation by layers in the stability of surrounding rock of deep well's large section cave,obtaining the stress- strain of excavation in layers,which shows that the size of excavation area directly influences the supporting parameter. The on- the- site industrial test monitoring shows that excavation by layers has advantages in the stability of surrounding rock of deep well's large section cave.
出处
《新余学院学报》
2016年第2期11-15,共5页
Journal of Xinyu University
基金
安徽省高校自然科学研究项目重点项目<深井软岩及动压影响下硐室群围岩控制与支护关键技术研究>(KJ2015A346)
安徽省高校省级优秀青年人才基金资助项目<深井软岩巷道底臌综合治理关键技术研究>(2012SQRL257)
淮南职业技术学院自然科学基金资助项目<深井高应力大变形软岩巷道新型复合支护技术研究及应用>(HKJ14-2)