摘要
针对移动模架造桥机施工周期相对较长的特点 ,结合京沪高速铁路中桥梁线路所占比例大的情况 。
In view of the long construction period of the normal movable form-frame,the movable form-frame bridge fabrication machine with cast-in-place for two or three spans synchronously is presented according to the large proportion of bridge track on Beijing-Shanghai High Speed Railway Line.
出处
《铁道工程学报》
EI
2003年第4期90-92,共3页
Journal of Railway Engineering Society