现场监测是岩土工程安全的重要环节,也是岩土工程生产的重要组成部分。文章在介绍某市浅滩围涂原位监测方案的基础上,综合分析地表沉降和深层水平位移监测数据,以有效对地基土层进行动态控制,掌握新建海堤的动态状况,预测工程完、竣工后的沉降量,确保海堤的稳定与安全,并验证项目设计思路,指导围堤生产工作,为后期该地区同类工程提供设计思路依据与宝贵经验。
In-situ monitoring is an important assurance and constituent part of the geotechnical engineering.This paperintroduced the in-situ monitoring project for the first stage of south embankment on the shoal in a city,then analyzed the observation date of ground surface settlement and deep horizontal displacement.There are three purposes in the insitu monitoring.Firstly,control the deformationdynamic of the foundationeffectively.Secondly,acquire the dynamic deformation of the new embankment to ensure itstable and safe.Thirdly,provide data for forecastingground surface settlement distortion,examining the design of this project and guiding construction in laterperiod.This paper can providethe designbasis and experience for the similarconstructional engineering in the area in the future.
出处
《工程技术研究》
2019年第17期24-27,共4页
Engineering and Technological Research
关键词
现场监测
地表沉降
深层水平位移
in-situ monitoring
ground surface settlement
deep horizontal displacement