摘要
阐述东方 1 - 1气田开发项目详细设计中对澳大利亚WORLEY公司分包商的管理 ,总结海洋石油开发工程中对外国设计分包商进行项目管理的经验及需要注意的问题 ,介绍WORLEY公司先进的管理方法。
This paper describes the management to WORLEY, an Australia subcontra ctor, in detail design of CEP/WHPE Platform for DF 1-1 gas field development pro j ect, summarizes some experiences and issues that should be noted in the manageme nt to foreign design subcontractor during the offshore engineering project, and introduces the advanced management method of WORLEY. All this may provide refere nce to other cooperative project management
出处
《中国海上油气(工程)》
2003年第6期46-48,共3页
China Offshore Oil and Gas