通过对涟钢高炉上渣处理设备安装过程中出现问题进行总结,在沙钢5800m3高炉IDE渣处理设备采用正确安装方法,对渣处理设备上主要零部件安装方法进行了较详细的叙述。
The slag processing equipment problems of blast furnace in Lianyuan Steel appeared during installation were summarized. The correct installation method was conducted in Shagang 5800m3 blast furnace IDE slag processing equipment. Installation method of main parts for slag processing equipment were described in detail.
出处
《冶金设备》
2015年第S2期70-71,39,共3页
Metallurgical Equipment
关键词
渣处理设备
转鼓
托辊
传动装置
试运转
Slag processing equipment
Drum
Support roller
Driving device
Test run