4[1]WESTNEY R E.Total Cost Management:AACE-I Vision for Growth[J].COST ENGINEERING,1992,(34):2-5.
5[2]EI-HARA M,HORNE R.Factors affecting life cycle cost in the construction industry[J].Proceedings of the 8th International Logistics Symposium,Exeter,1998,(8):1-2.
6[3]EI-HARA M,MARENJA K.Develepment of generic framework for collecting whole life cost data for the building industry[J].Journal of Quality in Maintenance Engineering,2002,(2):3-5.
7[4]WLCF.The National Initiative on Whole Life Cost,In Association with Building[R-l,WLCF launched in November,1999.
10[7]HEMPHILL R.A method for predicting the accuracy of a construction cost estimate[J].Transactions of the American Association of Cost Engineers,1968,(3):2-5.