摘要 为了探讨高速公路改扩建项目的临时安全设施设置方案,结合四川省成都市至乐山高速公路改扩建工程项目(以下简称成乐项目)的施工过程及保通要求,分析研究半幅路基封闭施工条件下的临时安全设施设置方案,并对作业区及道路分流引导区的临时安全设施设置方案进行探讨,得到了合理可行的临时交通安全设施设置方案,用以指导高速公路改扩建项目的施工。 In order to discuss the temporary safety facilities setting scheme of expressway reconstruction and expansion project, combining with the construction process and maintenance requirements of Chengdu-Leshan expressway reconstruction and extension project in Sichuan Province(hereinafter referred to as Chengle project), the temporary safety facilities setting scheme under the condition of half roadbed closed construction is analyzed, and the temporary safety facilities setting in the work zone and road diversion guide area is also studied. A reasonable and feasible scheme of temporary traffic safety facilities is obtained to guide the construction of expressway reconstruction and expansion projects.
作者 陈国龙 郑云壮 CHEN Guolong;ZHENG Yunzhuang(TianJin Municipal Engineering Design&Research Institute,Tianjin 300051,China;CCCC Infrastructure Maintenance Group Co.,Ltd,Beijing 100011,China)
出处 《交通与运输》 2019年第2期54-57,共4页 Traffic & Transportation
关键词 临时交通安全设施 作业区 改扩建工程 高速公路 Temporary traffic safety facilities Work zone Reconstruction and extension project Expressway
  • 相关文献

参考文献1

二级参考文献14

共引文献14

引证文献6

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部