摘要
在矿山回采落矿生产中,如何有效控制采场大块率需要不断研究和总结。本文阐述了某铁矿井下采场大块产生的原因与危害,提出在生产管理与工艺管理方面大块控制措施与方法。
It is necessary to study and summarize the effective methods of controlling the boulder yield in mine production.In this paper the causes and hazards of large blocks in an underground iron mine were expounded,and the control measures and methods in production and process management were proposed.
出处
《中国矿山工程》
2017年第2期35-37,共3页
China Mine Engineering