期刊文献+

10,000-ton production line expected to be completed and put into operation in Yulong Copper Mine,Tibet next year

10,000-ton production line expected to be completed and put into operation in Yulong Copper Mine,Tibet next year
原文传递
导出
摘要 Tibetan Commission of Reform and Develop- ment announced late December that Tibet will intensify the development of Yulong copper mine with the aim to complete and put into op- eration 10,000-ton production line of the mine in August 2008 according to the strategy
出处 《China Nonferrous Metals Monthly》 2008年第2期8-9,共2页 中国有色月刊(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部