摘要
At the end of 2007,Guangxi Longlin 100,000- ton/year aluminum plate and strip project started its construction.The project is invested and constructed by Guangxi Xiangji Non- ferrous Metal Ltd.with an investment of 1.26 billion yuan with the introduction of advanced equipment and technology from other coun- tries.It is planned to put into production in May 2009 with the production of medium to high class aluminum plate and strip.The