期刊文献+

Yichuan Power's High-precision Aluminum Belt Project Invests RMB2.95 Billion

Yichuan Power's High-precision Aluminum Belt Project Invests RMB2.95 Billion
原文传递
导出
摘要 Yichuan Power Group’s continuous casting and rolling aluminum belt project features an annual production capacity of 250,000 tons and commenced construction in April 2009.Total investment in the project will be RMB2.95 billion, and following production,sales income are projected to reach RMB5.2 billion,with profits and taxes amounting to RMB0.6 billion.
出处 《China Nonferrous Metals Monthly》 2010年第5期2-3,共2页 中国有色月刊(英文版)

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部