期刊文献+

Hailiang's Annual 90,000-ton Copper Pipe Project Settled in Jiangjin

Hailiang's Annual 90,000-ton Copper Pipe Project Settled in Jiangjin
原文传递
导出
摘要 Recently,Hailiang Group’s Southwest copper production base was formally settled in the Jiangjin Luohuang Industrial Park.It’s reported that the project has attracted a total investment of RMB3 billion,covering an area of 230 mu with an annual capacity of 90,000-ton copper pipes and60,000-ton copper busbars for air conditioning and refrigeration purposes(3 planned copper pipe production lines for refrigeration purposes,each
出处 《China Nonferrous Metals Monthly》 2018年第2期5-5,共1页 中国有色月刊(英文版)

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部