摘要 上海外滩596地块超深基坑紧邻地铁9号线区间隧道及一系列管线和建筑物。为控制基坑施工对周边环境(尤其地铁隧道)的影响,本项目设计采取分坑顺作、两墙合一地下连续墙、钢支撑轴力补偿体系、被动区加固、抽条分块开挖等系列措施。实测结果表明,远离地铁侧的地下连续墙最大变形为45.6 mm,邻近地铁侧地下连续墙最大变形为17.2 mm,邻近地铁隧道的最大隆起量为12.9 mm。所采用的设计方案满足了地铁的变形控制要求。 The deep excavation of Shanghai Bund 596 Plot is adjacent to the metro tunnels of Line 9,pipelines and buildings.In order to control the impact of excavation construction on the metro tunnels,many measures are adopted in the design of the project.The deep excavation is divided into four small pits,and the block excavation method was adopted.Dual-purpose diaphragm walls are used as retaining walls.The steel struts with automatic axial force compensation system are adopted in the small pits just adjacent to the metro tunnels.The soils in the passive zone are reinforced by triaxial cement-soil mixing piles.The monitored results show that the maximum lateral displacement of the diaphragm walls far away from the tunnels and that just adjacent to the tunnels are 45.6 and 17.2 mm,respectively.The maximum upheaving of the tunnels is about 12.9 mm.The design scheme satisfies the requirements of deformation control of the adjacent tunnels.
作者 徐中华 宗露丹 沈健 王卫东 XU Zhong-hua;ZONG Lu-dan;SHEN Jian;WANG Wei-dong(Shanghai Underground Space Engineering Design&Research Institute,East China Architecture Design&Research Institute Co.,Ltd.,Shanghai 200002,China;Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations,Shanghai 200002,China)
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2019年第A01期41-44,共4页 Chinese Journal of Geotechnical Engineering
基金 上海市科学技术委员会科研计划项目(13231201006)
关键词 基坑工程 地铁隧道 顺作法 分坑实施 实测分析 excavation metro tunnel bottom-up method sub-pitting measurement analysis
  • 相关文献

参考文献2

二级参考文献1

  • 1蒋洪胜.盾构法隧道管片接头的理论研究及应用:[博士学位论文].上海:同济大学,2000.12.

共引文献216

同被引文献492

引证文献64

二级引证文献196

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部