摘要 江阴长江公路大桥为悬索桥,主跨1385 m,南岸索塔身h为186.926 m(塔顶标高 192.926 m),索塔由两列塔柱(包括塔冠)及三道横梁组成门式混凝土框架结构,两列塔柱横桥向宽度不变,竖向内倾,斜率约1/50。顺桥向宽度由下向上均匀收缩,斜约1/60。柱底截面(6m×14.5 m ),柱顶截面(6 m×10.0m),塔冠截面(6 m×11m)工期为8个月。针对南索塔的施工特点,详细介绍了该桥施工的全过程,并重点叙述爬模施工工艺。 As a suspension bridge, the Yangtze River Highway Bridge at Jiangyin has a main span of 1385m with a cable tower at its south bank and the height of the tower is 186.926m (tower peak level; 192.926m). The cable tower is of portal concrete frame structure composed of two lines of tower columns (including tower cap) and three beams. These columns keep their width across the bridge unchanged but inward inclined vertically with the slope of around 1/50. A uniform contraction is from the bottom to the top along the bridge with the slope of around 1/60. The construction period is 8 months with the cross section at the bottom of the column(6 m x 14. 5 m) , the cross section at the top(6 m x 10.0 m) , the cross section of the tower cap(6 m x 11 m). According to the characteristics of the construction of the south cable tower, this paper illustrates the whole process of construction with the construction technology of climbing form as its emphasis.
作者 曾浩 张爱军
出处 《广西交通科技》 2003年第3期41-45,共5页 Guangxi Communication Science & Technology
基金 首届国际尤金.菲戈金奖 2002年度国家"鲁班奖" 2003年度国家科技进步奖推荐项目
关键词 江阴长江公路大桥 南索塔 悬索桥 爬模施工 爬架锚固 钢筋工程 混凝土工程 温度裂缝控制 the Yangtze River Highway Bridge at Jiangyin south cable tower climbing form construction technology
  • 相关文献

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部