摘要
吉林油田分层注水遵循定量注水政策,开发的是扶余和杨大层两个层系、多个小层,是典型的多层系开发油田,油田的开发效果完全取决于分注井是否能够分的开、注的进、测的出、调的准,吉林油田二次开发调整以来,注采井网完善程度提高,注采调控力度加大,对注水井的测调需求刚性增长,而人员设备不增、井况异常率提升,测试难度逐年增大,需要我们针对现状、当前制约测试效率提高的因素,找准问题,采取相应的对策,开展提高测试效率研究,确保测试工作提质提效。
The stratified water injection in Jilin Oilfield follows the quantitative water injection policy,and develops two layers and several small layers of Fuyu and Yangda layers.It is a typical multi-layer development oilfield.The development effect of the oilfield depends entirely on whether the separate injection wells can be separated,injection progress,measurement and adjustment.Since the secondary development adjustment of Jilin Oilfield,the improvement of injection-production well pattern and injection-production control ability have been improved.Increased degree,rigid increase in demand for water injection well survey and adjustment,but no increase in personnel and equipment,abnormal rate of well conditions,test difficulty is increasing year by year.We need to find out the problems,take appropriate countermeasures,carry out research to improve test efficiency,and ensure that the quality and efficiency of test work are improved.
作者
常亮
CHANG Liang(Jilin Oilfield Branch,Songyuan 138000,Jilin Province,China)
出处
《应用能源技术》
2019年第3期7-9,共3页
Applied Energy Technology
关键词
分注井
测试效率
配套技术
提质提效
满足注水
Separate injection well
Test efficiency
Matching technology
Improve quality and efficiency
Meet water injection