摘要
小关水库特大桥主墩承台基础的施工,由于制定了科学的施工方案,加强了现场施工控制,温控措施合理得当,结果令人满意。所有承台混凝土质量优良,没有出现温度裂缝,可供今后类似的大体积混凝土施工借鉴。
During the main stake basis platform in the biggest bridge of Xiaoguan reservoir,we have made the scientific construction methods and also reinforce the control of construction scene,the measure of temperature in correctly.So,we got the most satisfy.All the content in platform are in best quality without any rift caused by temperature.All of them could provide us the guide in future construction of the big physical volume concrete.
出处
《交通标准化》
2004年第1期60-62,共3页
Communications Standardization