摘要
文章指出了在电力工程水文气象勘测中导线覆冰、雷电日数、设计风速等重要参数在具体使用中容易出现的一些问题 ,并提出了解决问题的办法和思路。
The paper indicates some frequently occurred problem of transmission line covering ice,lightning days,and designed wind speed during electric power engineering's hydrological and meteorological observation process,and proposes the problem solving method and thread.
出处
《青海电力》
2003年第C00期20-21,24,共3页
Qinghai Electric Power
关键词
电力工程
气象勘测
导线覆冰
送电线路
施工
Transmission line conering ice Lightning days Designed wind speed