输电线路防冰闪故障方法 被引量:2

The Method of Avoiding Flashlover Malfunction for Electric Transmitting Line
下载PDF
导出
摘要 1998年底阳泉地区发生线路绝缘子覆冰闪络故障,对线路安全运行造成了威胁。绝缘子发生冰闪的主要原因是冰凌桥接绝缘子串裙边,而融冰水电导率高,造成冰闪电压大为降低。阻隔导电率高的融冰水形成闪络通道的水帘,是提高覆冰绝缘子串冰闪电压的基本措施和方法。 The running safety of line was threatened by insulator sleet covering flashover derault of line at the late of 1998.Because the icicle bridge jointed the outskirts of insulator and the electrical conductivity of sleet melting water is high,the sleet covering flashover voltage decreased greatly,and the insulator sleet covering flashover happened.To increase the sleet covering flashover insulator cluster voltage,the basic measure and method is to interlude the sleet melting water to high electrical conductivity with flashover channel water screen.
机构地区 阳泉供电分公司
出处 《山西电力》 2003年第6期1-3,共3页 Shanxi Electric Power
关键词 输电线路 绝缘子 防冰闪 故障 绝缘子串 覆冰 insulator cluster sleet melting flashover method
  • 相关文献

同被引文献12

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部