摘要
在三峡工程混凝土纵向围堰上游端部拆除前后的爆破试验和施工爆破过程中,对混凝土大坝及其周围建(构)筑物的关键部位进行了振动测试。爆破效果调查表明,此次围堰拆除爆破是成功的。
During the blasting test and construction blasting of the upstream longitudinal concrete cofferdam of Three Gorges Project, vibration monitoring was conducted at the key locations of concrete dam and its surrounding structures. The post-blasting investigation of the effect of blasting indicated that the demolition blasting of the cofferdam was successful.
出处
《长江科学院院报》
CSCD
北大核心
2003年第B12期107-109,共3页
Journal of Changjiang River Scientific Research Institute
关键词
三峡工程
纵向围堰
施工爆破
振动测试
安全监控
cofferdam
blasting test
construction blasting
vibration monitoring
investigation of blasting effect