三峡二期下游围堰混凝土防渗墙拆除爆破试验研究 被引量:4

Experimental research of blasting demolition of concrete cut-off wall in second-stage downstream cofferdam of Three Gorges Project
下载PDF
导出
摘要 由于三峡二期下游围堰混凝土防渗墙部分墙段内有灌浆施工时预埋的钢管及固定钢管的保持架,这种结构在以往的围堰防渗墙爆破拆除工程中没有先例。为此着重介绍了钢管爆破试验、爆破网络模拟试验及混凝土防渗墙现场爆破试验的试验方法及试验成果,并通过三峡二期下游围堰爆破拆除工程实践,证明了防渗墙爆破拆除设计方案达到了安全可靠经济合理的要求。 Under the condition of limited demolition duration, with a great quantity of excavation under water, especially the fact that there were grouting steel tubes and holding frames within the concrete cut-off wall and the demolition of this kind of structure has never been faced before, the demolition work of the second-stage downstream cofferdam in the Three Gorges Project was of great difficulty. The blasting experiments of steel tube, the simulation of blasting initiation network, and the demolition of the cut-off wall are introduced in the paper.
出处 《长江科学院院报》 CSCD 北大核心 2003年第B12期62-65,共4页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 围堰 混凝土防渗墙 拆除爆破 钢管炸断 净间距 cut-off wall steel tube blasting demolition experiment
  • 相关文献

参考文献1

  • 1曹稼良.葛洲坝大江上游围堰混凝土防渗心墙拆除爆破技术[R].武汉:长江水利委员会长江勘测规划设计研究院,1988.

同被引文献11

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部