摘要
以耒阳电厂灰坝工程施工为例,详细介绍了耒阳电厂灰坝沉井三种施工方案,并从劳动力,机具及成本等三个方面进行了比较、探讨。
The paper introduces three construction projects on ash-dam at Leiyang Electrical power plant.compures them according to Labor.equipment and cost as well
出处
《中外建筑》
2003年第4期100-101,共2页
Chinese & Overseas Architecture