摘要
随着科学技术的不断发展,接触网轨槽预埋施工技术也在不断改进和创新。结合高速铁路隧道接触网实际的施工情况,避免一些因素对施工质量、施工进度造成影响,是确保高速铁路隧道接触网轨槽预埋施工质量的关键。
With the continuous development of science and technology,the pre-embedded construction technology of the contact net rail is also in constant improvement and innovation. In addition,it is important to avoid some factors affecting the construction quality and construction progress and it is the key to ensure the quality of pre-embedded construction technology of the contact net rail in the high speed railway tunnel.
出处
《湖北三峡职业技术学院学报》
2015年第2期93-96,共4页
Journal of Hubei Three Gorges Polytechnic
关键词
高速铁路隧道
接触网
轨槽
预埋施工技术
high speed railway tunnel
contact net
rail groove
pre-embedded construction technology