摘要
针对大截面导线接续压接质量控制难度大、压接耗时长的特点,通过对常见压接质量问题和影响压接效率的主要因素进行全面分析,结合施工经验制定出确保接续压接质量、提高接续压接施工效率的有效措施,供施工同行参考借鉴。
Pick to:in view of the large cross-section wire in place of pressure welding quality control is difficult and time-consuming long pressure characteristics, based on the common quality problems and pressure to the main factors influencing the efficiency of pressure to conduct a comprehensive analysis, combined with construction experience to develop to ensure that in place of pressure welding quality, the effective measures to improve efficiency in the construction of pressure, provide reference for the construction industry reference.