摘要
湖北潘口水电站、老挝南塔河1#水电站大坝均为面板堆石坝,在填筑过程中,均采用了挤压边墙施工技术,根据两个工程实践经验,本文重点阐述挤压边墙施工过程以及过程中的质量控制,并对各工序进行详细描述。
In the process of filling,the construction technology of the side wall is adopted.According to the experience of the two engineering practice,this paper focuses on the construction of the dam in the dam,which is a concrete face rockfill dam in the Panyou Hydropower Station and the Nan Tahe 1 # Extrusion sidewall construction process and the process of quality control,and a detailed description of the various processes.
出处
《中国标准化》
2016年第17期168-168,共1页
China Standardization
关键词
面板堆石坝
挤压边墙
施工过程
face rockfill dam extrusion side wall construction process