基于利益协同的船舶企业外协用工管理模式浅析 被引量:2

Analysis of Nonnative Labor Management Mode in Ship Enterprises Based On Benefit Coordination
原文传递
导出
摘要 船舶企业使用外协用工解决了船舶生产对工人的巨大需求问题,但同时外协用工的大量使用也带来了很多管理方面的问题。本文从利益协同的角度,对船舶企业的外协用工管理模式进行研究探讨。首先对船舶企业的生产管理基本形式,以及船舶企业和外协用工之间的利益协同关系进行阐述,然后根据船舶企业和外协员工之间利益协同的关系,将船舶企业的外协用工管理分为三种管理模式,并根据案例分析对比结果给出船舶企业和外协用工之间的利益协同的实现方式,为船舶企业生产管理决策提供参考。 . Using of temporary Labor has solved the problem of huge demand of workers for ship building in ship enterprises,but it brings some problems of management. In This paper,the labor management is studied from the perspective of benefit coordination between ship enterprise and temporary workers. The definition of ship production management and the relationship of benefit coordination between ship enterprises and temporary workers are described first,and then the labor management is divided into three modes according to relationship of benefit coordination between ship enterprise and temporary workers, and finally presents the realization methods of the benefit coordination based on case analysis and comparison. It will provide a reference for decision-making of production management.
出处 《中国管理科学》 CSSCI 北大核心 2016年第S1期100-105,共6页 Chinese Journal of Management Science
基金 中国博士后基金资助项目(2016M590276) 黑龙江省自然科学基金资助项目(QC2016095) 黑龙江省博士后基金项目(LBH-215047) 中央高校基本业务专项基金资助项目(HEUCF150903)
关键词 船舶企业 外协用工 利益协同 管理模式 ship enterprise temporary labor benefit coordination management mode
  • 相关文献

参考文献6

二级参考文献18

  • 1王晓婷.新劳动合同法下企业如何有效避免劳动争议[J].现代经济信息,2008(10):180-181. 被引量:1
  • 2王淑晶.国有企业人力资源管理存在的问题及对策[J].学术交流,2006(10):111-113. 被引量:46
  • 3Vanderbeck, F. , Wolsey, L.. An exact algorithm for IP column generation[J].Operations Research Letters, 1996,19: 151-159.
  • 4Perrot, N.. Advanced IP column generation strategies for the cutting stock stock problem and its variants[D]. France: University Bordeaux, 2004.
  • 5Fredley, M.. A decomposition approach for the multimodal, resource- constrained, multi- project scheduling problem with generalized precedence and expediting resources [D]. France.. Air Force Institute of Technology, 2001.
  • 6Akkan, C. , Drexl, A. , Kimms, A.. Network decomposition- based benchmark results for the discrete time - cost tradeoff problem[J].European Journal of Operational Research, 2005,165 : 339-- 358.
  • 7Bellenguez, O.. Methods to solve multi--skill project scheduling problem [J]. 4OR-A Quarterly Journal of Operations Research, 2008, 6 (1) : 86- 88.
  • 8Drezet, L. , Billaut, J.. A project scheduling problem with labour constraints and time--dependent activities requirements [J]. European Journal of Operational Research, 2008, 112.. 217--225.
  • 9Wu, W. , Sun, S.. A project scheduling and staff assignment model considering learning effect [J]. International Journal Advanced Manufacture Technology, 2006, 28:1190-1195.
  • 10Heimerl, C., Kolisch, R.. Scheduling and staffing multiple projects with a multi--skilled workforce[J]. DOI 10. 1007/s00291-009-0169-4, 2009.

共引文献35

同被引文献6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部