摘要
On March 26th,CNPC formally com-menced construction of Dina 2 Gas Field,which is located in Kuche depression in the Tarim Basin,Xinjiang Autonomous Region.The gas field is composed of two blocks- Dina 1 and Dina 2,with a cumulative proved gas in place volume of 175.2 billion cubic meters and gas condensate reserves of 13.39 million tons.It is by far the larg-est condensate gas field ever discovered