The hydraulic engineering body of the 300 000 tons of crude oil terminal at Tianjin Port is basically completed through the two-year construction.Tianjing Port is expected to in-vest RMB 1.379 billion for the terminal project.The terminal can berth crude oil tankers with 100 000-300000 tonnage and has a design handling capacity of 20