摘要
详细介绍了海洋石油平台上部模块传统建造工艺和一体化建造工艺,对两种工艺的优缺点进行了对比分析,得出一体化建造工艺在缩短工期、提高质量、降低成本方面的优势。并介绍了一体化工艺建造过程中的重点注意事项,具有重要的实用价值。
This paper illustrates the traditional construction process and integrated construction process in details of offshore oil platform topside.After the comparative analysis,the integrated construction process,compared to the traditional construction process,has advantages on shortening the construction schedule,improving the quality and decreasing the cost.The key points during the execution of integrated construction process are also pointed out and they are high valuable reference for practice.
出处
《中国海洋平台》
2012年第S1期107-112,共6页
China offshore Platform
关键词
海洋石油平台
上部模块
建造工艺
对比分析
offshore platform
topside
construction process
comparative analysis