4BIAN Yong-ming, JIANG Jia, JING Zhong, et al. Design and application of hydraulic-walking incremental launching equipment[ J ]. Open Construction & Building Technolo- gy Journal,2012(6) :1-7.
5BIAN Yong-ming, LI An-hu, JIN Xiao-lin, et al. Coupling analysis method for a large-scale structure exposed to syn- chronous hoisting loads [ J ]. Virtual and Physical Prototy- ping,2009,4(3 ) : 131-141.