南小线开发区段(响水河村至三江大道段)高填地段过渡路面永久性施工技术方案探讨

Permanent construction of transition pavement in high fill section of Small South line development section (Xiangshuihe Village to Sanjiang Avenue section)
下载PDF
导出
摘要 南小线开发区段(响水河村至三江大道段)最高填方地段因受中石化输油管及1#桥施工进度影响,最高填方施工5月底才能启动。文章根据路面实际情况,得出了具体的施工方案,即设置过渡路面通车,经雨季沉降观察稳定后施作永久性路面。 Due to the influence of Sinopec pipeline and the 1# bridge construction progress,construction of the highest filling area in South Small Development Zone(Xiangshui River Village to the Sanjiang avenue section) could be started by the end of May. According to the actual situation of road surface,the specific construction scheme was obtained,that is,the transition road was open to traffic,and the stability was observed after the rainy season to determine if it could be used as permanent pavement.
出处 《智能城市》 2016年第2期76-77,共2页 Intelligent City
关键词 南小线 过渡路面 施工方案 研究 Southern Small Line transitional pavement construction scheme research
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部