期刊文献+

污水厂提标工程中配电设计初探 被引量:1

Discussion on Power Distribution System Upgrading Project in Sewage Treatment Plant
下载PDF
导出
摘要 本文简要介绍了北京市采育镇污水处理厂提标改造工程和西安庄里镇提标改造及中水回用工程的变配电系统。针对污水厂采用的提标工艺测算了对应的负荷增量,明确高用电单体负荷,同时综合分析电耗增加量与提标水量的关系,为同类型项目估算单位出水能耗指标提供参考。 This paper introduces the power distribution system of BEIJING CaYu High-Tech Zone sewage treatment plant and XI’AN ZhuangLi Country High-Tech Zone sewage treatment plant.Power consumption has been calculated according to the operating characteristics of processing equipment.Meanwhile,based on the date,summarize the relationship between power consumption and water feeding rate.The provided reference could afford a lot of assistance to the engineer in investment estimating for upgrading and reconstruction project.
作者 何冠宏 He Guanhong(Tianjin Municipal Engineering Design&Research Institute,Tianjin 300392,China)
出处 《智能建筑电气技术》 2019年第4期41-44,共4页 Electrical Technology of Intelligent Buildings
关键词 污水处理厂 提标改造工程 变配电系统结线 能耗分析 sewage treatment plant upgrading and reconstruction project power distribution system structure diagram analysis of power consumption
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部