摘要
介绍了某炼铁高炉无料钟炉顶钢圈施工工程概况 ,结合对钢圈水平度的要求 ,详细阐述了其施工准备及安装工艺流程 ,提出了具体的施工安装要点 。
The general situations of the installation work of bell less top steel ring is introduced in this paper and combined with requirements on levelness of steel ring corresponding preparation work and installation process are elaborated in detail as well as the installation key points in construction in order to ensure safe running of equipment.
出处
《山西建筑》
2004年第4期33-34,共2页
Shanxi Architecture
关键词
炼铁
高炉
钢圈
安装
水平度
炉壳
steel ring, installation technique, levelness, blast furnace