7Sonke Hartmann,Dirk Briskorn.A survey of variants and extensions of the resource-constrained project scheduling problem[].European Journal of Operational Research.2010
4KOLISCH R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation[ J]. European dournal of Operational Research, 1996,90 ( 2 ) :320333.
5HARTMANN S, BRISKORN D. A survey of variants and extensions of the resource-constrained project scheduling problem [ J ]. European Journal of Operational Research,2010, 207( 1 ) :1-14.
6BROWNING T, YASSINE A. Resource-constrained multi-projectscheduling: priority rule performance revisited [ J]. International Journal of Production Economics,2010,126(2) :212-228.
7CHEN Jia-qiong, ASKIN R G. Project selection, scheduling and resource allocation with time dependent returns[ J]. European Journal of Operational Research ,2009,193 ( 1 ) :23,34.
8PETEGHEM V,VANHOUCKE M. A genetic algorithm for the preemptive and non-preemptive multi-mode scheduling problem [ J]. European Journal of Operational Research ,2010,201 ( 2 ) :409-418.
9BROWNING T R, EPPINGER S D. Modeling impacts of process architecture on cost and schedule risk in product development [ J ]. IEEE Trans on Engineering Management, 2002,49 ( 4 ) : 428443.