通过在岩平线岩滩电厂侧安装高压并联电抗器,有效地改善了机组低谷时段的进相问题,提高了机组运行的稳定性,有效地解决了母线电压偏高和机组进相问题,文章分析了高压并联电抗器在运行过程中产生的影响,为今后制定控制对策提供了参考,对岩滩水力发电厂的安全性和经济运行起到了重要作用。
After inspecting and installing high voltage shunt reactors in Yanping Line Yantan Power Station,the problems, leading phase at the low of units and the high voltage of buses and the stability of the units are solved effectively.The paper analyzes the influence of high voltage shunt reactors during operation for future reference,which will play an important role in the safe and economic operation of the plant.