期刊文献+

三峡永久船闸一期高边坡监测锚杆应力分析 被引量:15

Analysis of first?stage monitoring anchor bar stress on high slope of TGP permanent lock during operation
下载PDF
导出
摘要 为监测三峡永久船闸一期高边坡运行期岩体锚固效果,在部分断面的锚杆上安装了锚杆应力计。监测结果为:32根监测锚杆中,拉应力大于30MPa的有3支;压应力大于30MPa的有4支;其余锚杆应力计测值绝对值均小于20MPa,绝大部分锚杆应力基本稳定。这表明边坡锚杆受力不大。对"变形应力为主型"锚杆应力测值统计模型分析得出,近3年的趋势分量增量分别为2.34,1.85,1.53MPa,也说明监测锚杆处的高边坡岩体已趋于稳定。 For monitoring the effects of anchorage of the anchor bars buried in the high slope of TGP permanent lock, 32 anchor stress?meters were installed in partial cross?soctions. Among them, the tensile stress in 3 instruments was over 30 MPa, the pressure stress in 4 instruments more than 30 MPa, and the absolute values of the rest were lower than 20 MPa. The monitoring results show that most of anchor bar stresses are stable basically and the stresses in anchor rods small. A statistics model was established by analyzing superposition streses caused by deformation and by temperature. It was concluded from analysis that the increments of trend component in recent 3 years were (2.34 MPa), (1.85 MPa) and (1.53 MPa),respectively. These data indicate that the deformation of the high slope with anchor bars tends towards stability.
出处 《长江科学院院报》 CSCD 北大核心 2004年第1期40-42,46,共4页 Journal of Changjiang River Scientific Research Institute
关键词 永久船闸 锚杆应力 统计模型 高边坡 anchor bar stress system analysis statistical model high rock slope permanent lock.
  • 相关文献

参考文献1

二级参考文献1

  • 1冯兴常,三峡水利枢纽永久船闸高边坡监测资料研究分析报告,1996年

共引文献4

同被引文献102

引证文献15

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部