4S. Ping Ho. Bid compensation decision model for projects with costly bid preparation [J]. Journal of Construction Engineering and Management, 2005 (2): 151-159.
5S. Ping Ho, Liang Y. Liu. Analytical model for analyzing construction claims and opportunistic bidding[J]. Journal of Construction Engineering and Management,200g (2): 94-104.