中牟绿博文化产业园区绿博2号安置区一期工程项目共48栋住宅,布置37台塔吊,属于典型的群塔作业,塔吊的布置除了要考虑安全因素之外,还需要考虑对结构及后期施工的影响,通过各种分析及演示,确定了各塔吊的合理位置,保证了施工的顺利进行。
In Zhong Mou green Po#2 first phase of the relocation areas,for example,The project,a total of 48 homes,need to set up 37 sets of tower crane,Belongs to the typical group of tower operation.In addition to the layout of the tower crane safety factors to consider,also need to consider the structure and the influence of the later construction.Through a variety of analysis and demonstration,to determine the reasonable position of the tower crane,ensure the smooth progress of the construction.
作者
徐鹏程
胡一坦
朱文巍
Xu pengcheng;Hu yitan;Zhu wenwei(China construction one Bureau Group No.1 Construction Co.,Ltd,Shanghai 200000)
出处
《住宅与房地产》
2018年第2X期217-218,共2页
Housing And Real Estate
关键词
塔吊
结构
安全
影响
Tower Crane
Structure
Safety
Affect