摘要
文章结合实例,针对苏州河段深层排水调蓄管道系统工程中的超深地下连续墙施工阶段,从技术与管理多角度入手,通过创新的BIM技术与开发的BIM系统管理平台,辅助指导了现场作业,弥补了传统管理方式的薄弱环节,提高了项目管理的精度及细度。
Based on the example,this paper focuses on the construction stage of ultra-deep underground continuous wall in the deep drainage and drainage pipeline system engineering of Suzhou Creek,starting from the perspective of technology and management.Through the innovative BIM technology and development of the BIM system management platform,assisted in guiding the on-site operations,making up for the weak links of traditional management methods and improving the accuracy of project management.And fineness.
作者
茅昕钰
Mao Wei(Shanghai Basic Engineering Group Co.,Ltd.,Shanghai 200002)
出处
《住宅与房地产》
2019年第5期170-171,共2页
Housing And Real Estate
关键词
超深地下连续墙
BIM技术
综合应用
ultra-deep underground continuous wall
BIM technology
comprehensive application