5Jiangjiang Wang,Zhiqiang Zhai.Optimization design of BCHPsystem to maximize to save energy and reduce environmentimpact[J].Energy,2010,35:3388-3398.
6Jiang-Jiang Wang,You-Yin Jing,Chun-Fa Zhang.Optimizationof capacity and operation for CCHP system by genetic algorithm[J].Applied Energy,2010,87:1325-1335.
7Kong XQ,Wang RZ,Huang XH.Energy optimization model fora CCHP system with available gas turbines[J].Applied ThermalEngineering,2005,25(2):377-391.
8Zhang B,Long W.An optimal sizing method for cogenerationplants[J].Energy and Buildings,2006,38(3):189-195.