4Xiaoling Zhang, Martin Skitmore, Yi Peng. Exploring the challenges to industrialized re-sidential building in China[J]. Habitat International, 2014 ( 41 ) : 176-184.
5Safa M, Shahi A, Nahangi M, et al. Automating measurement process to improve quality management for piping fabrication[C]//Structures. Elsevier, 2015 ( 3 ) : 71-80.
6Chen L J, Luo H. A BIM-based construction quality management model and its applications[J]. Automation in construction, 2014 ( 46 ) : 64-73.
7Nahangi M, Haas C T. Automated 3D compliance checking in pipe spool fabrication[J]. Advanced Engineering Informatics, 2014, 28 (4) : 360-369.
8Kwon O S, Park C S, Lim C R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality[J]. Automation in construction. 2014 (46) : 74-81.
9Kwon O S, Park C S, Lim C R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality[J]. Automation in Construction, 2014 (46) : 74-81.
10Park C S, Lee D Y, Kwon O S, et al. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J]. Automation in Construction, 2013 (33) : 61-71.