摘要
在岩基和水深较大的位置修筑水泵房时,在底板设置锚筋,对泵房抗浮、改善泵房内力分布,利用自然条件降低工程造价,起到较好的作用。对底板设置锚筋的圆形水泵房进行内力分析研究,并在来宾电厂水泵房中应用,取得很好的效果。
When the pump house is builton a larger rock in deeperwater,to install the reinforced an chorage on the motherboard has a better function of anti- floating,improving inner force distribution and using the natural condition to lower the projectcost.Its inner force analytic research was accom- plished,applied to laibin power plantpump house and got very good effect. [