期刊文献+

冶金冷轧薄板企业生产计划调度体系结构及方法研究 被引量:5

Research on the Structure and Method of Production Planning and Scheduling for Cold-rolled Sheets Plant
下载PDF
导出
摘要 本文在三层企业集成模型的基础上 ,针对冷轧薄板企业的产品、经营、生产及设备等特点 ,提出了冷轧薄板企业的多级计划与调度体系结构 ,并引入了以生产线控制机制为核心的企业经营生产全过程闭环优化集成模式 .同时还对企业生产组织中的各级优化问题及方法进行了全面的分类研究 ,为进一步的研究和冷轧薄板企业集成应用系统的开发奠定了基础 . According to the features of cold-rolled sheets plant such as product, business, production operation, equipment, etc., the multi-level production planning and scheduling structure under 3-layer enterprise integration model is introduced. Also a control mechanism is used to establish the closed-loop optimization integration model for total process of enterprise business and production operation. At the same time, a detail classification research of optimal problems in enterprise production organization at different levels is given. Based on this work, further research and system development for enterprise application integration can be implemented in the future.
出处 《信息与控制》 CSCD 北大核心 2004年第1期31-35,共5页 Information and Control
基金 国家 8 63计划资助项目 ( 2 0 0 2AA412 62 0 )
关键词 生产线控制 钢铁企业 冷轧工艺 自动化控制 企业管理 production planning and scheduling system structure optimization method
  • 相关文献

参考文献3

二级参考文献4

  • 1[1]ASSAF I, CHEN M,KATZBERG J. Steel production schedule generation[J].International Journal,1997,35(2):467-477.
  • 2[2]ARIZONO N, SAEKI T, et al.Expert system for scheduling rolling sequence in plate mill[J]. KOBELCO Technology Review,1991,(10):47-49.
  • 3[1]MOHANTR R P, SINGH R. A hierarchical production planning approach for a steel manufacturing system[J]. International Journal of Operations and Production Management, 1991,(12):69-78.
  • 4[2]ASSAF I, CHEN M, KATZBERG J. Steel production schedule generation[J].Int.Jour. Prod.Res, 1997,35(2):467-477.

共引文献7

同被引文献34

引证文献5

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部