工程合同索赔包含工期索赔和经济索赔。工期索赔的目的首先是延长工期,避免遭受工期延误罚款;其次是给经济索赔的合法性奠定合同基础。合同索赔是目前建筑市场中承包商利润主要来源。做好合同内索赔不但能提高承包商对国际工程施工管理的能力,而且能够给建筑商带来可观的经济效益。
Engineering contract claim includes claim for extension of time and financial claims. The object of claim for extension of time is to extend the construction time, to avoid the penalty for delay, and then provide the contract foundation for legality of financial claim. Contract claim is one of the main resources of contractors' profit. Not only can contract claim enhance the ability of contractors to manage international engineering, but also can bring considerable financial benefit.