摘要
通过一个变电所工程投运后,电缆间产生较大的感应电流,造成不能正常供电运行,论述如何从理论和实践方面分析原因,采取措施,消除不正常现象。同时,也指出单芯大截面电缆施工设计中应注意的事项。
A substation can't operated normally because of induction current among cables. The paper analyses this phenomenon from theory and practice, and introduces measures to eliminate this abnormal situation. It also points out issues under concerning in cables engineering design.
出处
《建筑电气》
2004年第1期3-6,共4页
Building Electricity