摘要
介绍了某工程基坑开挖采用水泥搅拌桩作支护结构的工程实例 ,着重叙述了水泥搅拌桩挡墙的设计计算要点。该建筑物基坑在地质条件与周围环境较差的情况下 ,采用水泥搅拌桩支护结构方案 ,达到了预期的目的 。
The project is introduced that cement-mixing pile is used as a support of foundation ditch.The design points of cement-mixing pile barricade are described emphatically.Using this method,the strength of foundation ditch in bad geological conditions and surrounding environment is enough.
出处
《吉林电力》
2004年第1期4-6,共3页
Jilin Electric Power